How it works

Review job status in the task calendars and download a reporting spreadsheet from the tasks area. Use the team-job list to review completed work by person and period.

Your subscription must include access to the task module. The team-job list and export are available to team owners, administrators and rental managers.

Choose a calendar

Open the tasks area and choose the view you need:

View What you see
Calendar Jobs organised by rental alongside bookings.
Resource Calendar Jobs organised by person and role, without booking bars.

Choose the month and narrow the rentals or people as needed. Open a job bar to see the job itself.

Read the colours

For rental-linked job bars in the task calendar, and job bars in the resource calendar, read the border first. For unfinished jobs, warnings take priority over ordinary assignment colours:

Border Meaning
Green Other pending work, including jobs assigned to a person.
Blue The job is waiting for a person to take it. Red and due-today warnings take priority.
Orange The job is due today. Red warnings take priority.
Red Overdue work or a job that cannot be assigned to anyone.

Completed job bars have a pale-green fill when you are not hovering over them. Completion does not by itself confirm inspection; open the job to check its inspection status.

For unfinished jobs on compact job-list cards, use these background colours:

Background Meaning
White Other pending work.
Pale blue Work awaiting a person.
Pale yellow Work due today.
Pale red Overdue or unassignable work.

Read the status text as well as the colour.

Review and export a period

  1. Open the tasks area, then Team Jobs.
  2. Choose Completed.
  3. Select the rentals, team members and date range you need.
  4. Open Export to reach the Excel export dialog. If you have selected job rows, open Show actions first.
  5. Review the Only completed Jobs checkbox. Turn it on if you want a completed-work report.
  6. Choose Export to confirm.

Rental Ninja prepares the export in the background and emails you a download link for the archive containing the spreadsheet.

The export's period uses each job's scheduled start date, not its completion date. The Completed list uses the same date basis. The export can include unfinished jobs if you leave Only completed Jobs unchecked.

Understand the spreadsheet

The report includes:

  • Rental and job name.
  • Assignee.
  • Start and end times.
  • Duration.
  • Completion time.
  • Inspector and inspection time.

It is a job summary, not a checklist or photo report.

The start and end times describe the scheduled job window. The duration shows the difference in hours, rounded to 2 decimal places. It is not an automatic measurement of hours worked. Check it before using the report to calculate hourly pay.

The INSPECTED? column indicates whether an inspector is assigned, not whether inspection has finished. Check the inspection time for a recorded inspection.

Good to know

  • Rental owners do not see the task calendars in the tasks navigation. For access changes, see Roles and permissions.
  • The task module is not available in the Tokeet-branded app.
  • Without an explicit person selection, the resource calendar hides member rows with no returned jobs in the displayed month. If someone is missing, check the month and filters before treating it as a team-membership problem. Selecting that person explicitly allows an empty row to remain visible.
    Why it works this way

    Without a team-member selection, the resource calendar hides rows with no jobs in the displayed period. A missing row does not necessarily mean the person has left your team.

  • Jobs without a rental in the task calendar use a separate colour scheme: their ordinary assigned-job outline is teal.
  • The completed-only export option is initially unchecked. Its current selection can remain when you reopen the export dialog.
  • A job completed during the month can fall outside the export if its scheduled start was earlier.
  • Jobs without a scheduled start date do not match the export period. The spreadsheet shows zero duration if an exported job has no scheduled end time. It also shows zero if the start is not before the end.

You can narrow the on-screen list by job name. You can also filter by scheduled job type where that filter is available. If the cleaning jobs you want to report on have a distinct name, filter the downloaded spreadsheet by that name.

Note

The export is not a copy of selected rows or every on-screen filter. It uses the rental, person and date selections, plus the completed-only option. If you select specific people rather than the whole team, the export includes only jobs assigned to those people. Job-name, scheduled-job-type and accounting-only filters are not carried over. The on-screen setting for including jobs without a rental is not carried over either. Those jobs can still appear when you have access to them.